KOASTAL ECO IS HONOR TO BE APPOINTED AS GENERAL CONTRUCTOR OF AN PHAT 1 INDUSTRIAL PARK’S CENTRALIZED WASTEWATER TREATMENT PLANT LEVEL 1, MODULE 2: 24.000 M3/DAY-NIGHT (NO.71)

KOASTAL ECO IS HONOR TO BE APPOINTED AS GENERAL CONTRUCTOR OF AN PHAT 1 INDUSTRIAL PARK’S CENTRALIZED WASTEWATER TREATMENT PLANT LEVEL 1, MODULE 2: 24.000 M3/DAY-NIGHT (NO.71)

Project news

Posted on: 21.11.24

KOASTAL ECO IS HONOR TO BE APPOINTED AS GENERAL CONTRUCTOR OF AN PHAT 1 INDUSTRIAL PARK’S CENTRALIZED WASTEWATER TREATMENT PLANT LEVEL 1, MODULE 2: 24.000 M3/DAY-NIGHT (NO.71)

1. An Phat 1 Industrial Park’s Centralized wastewater treatment plant module 2 with the capacity of 24.000 m3/day.

After successfully completing “An Phat 1 Industrial Park’s Centralized wastewater treatment plant module 1 with the capacity of 1.000 m3/day-night” project, The Investor, An Phat high-tech Industrial Park joint stock company (An Phat Complex), has been appointed Koastal Eco Group to become the EPC general contructor of An Phat 1 Industrial Park’s Centralized wastewater treatment plant module 2 with the capacity of 24.000 m3/day-night. This expansion has been increasing the plant’s total capacity upto 25.000 m3/day, which aims at meeting the growing discharge from factories in the Industrial Park.

AnPhat 1 Industrial Park’s Centralized Wastewater Treatment plant with a total capacity of 25.000m3/day

The project marked a new chaper as uplifting the project number that Koastal Eco contructed up to number 71. Furthermore, this is also the 3rd Industrial Park Centralized wastewater treatment plant level I with the capacity exceeding 20.000m3/day that Koastal Eco has been implementing as an EPC General Contructor. So far, Koastal Eco has been constructing the two bellow ones:

- Yen Binh industrial, servive and rural zone’s centralized wasewater treatment plant with the total capacity of 55.000 m3/day

- Rang Dong textile Industrial Park’s centralized wastewater treatment plant module 1 with the total capacity of 110.000m3/day, in which the module 1 capacity is 4.000m3/day-night.

2. About the An Phat 1 Industrial Park at Hai Duong province

The An Phat 1 Industrial Park is situated at Km69, National highway no.37, covering the total land area of 180 hetares with the invested capital of nearly 2.000 bilions VND. This area is not only considered a trade connection with the Northern’s industrial and service hubs, but also a critical transit center of the regional’s economic corridor. The construction of new wastewater treatment plant will help the Investor to address growing wastewater discharge demands while meeting the rising needs among the secondary investors. 

3. The applied technology in An Phat 1 Industrial Park ‘s centralize wastewater treatment plant module 2

With a strong commitment to the motto: “maintaining and developing high-tech as well as environmentally friendly induatrial zones at Hai Duong province”, The investor of An Phat 1 industrial park has been choosing to adopt SBR (Sequencing Batch Reactor) technology which is researched and developed by KoastaL Eco to apply in both wastewater treatment plants (module 1 and module 2). This is considered a steady step that offering long-lasting benefit for the Investor.

When applying SBR techonology, Koastal Eco commits to provide customers not only a conventional wastwater treatment system but also meet the four following criteria:

  • Minimal land usage
  • Lowest operational costs
  • Reasonable investment costs
  • High aesthetic standards

The growing number of projects entrusted to Koastal Eco without the need for competitive bidding is a powerful demostration to the company's reputation and brand value in the environmental sector that Koastal Eco has built over nearly two decades. The credibility from Investor is rooting from Koastal Eco’s high-quality, on time and sustainable solutions in every project provided. Currently, Koastarl Eco is holding the leading market share in the field of centralized industrial wastewater treatment and proud to be recognized as a strategic partner capable of managing large-scale and super-large projects.