Recently, Koastal Eco Group and the Investor – Minh Hung Sikico Industry Joint Stock Company and GS Engineering & Construction held the commencement ceremony “The central textile and dyeing wastewater treatment plant of Minh Hung – Sikico IP with a total capacity of 25,000 m3/ day, capacity of phase 1: 10,000 m3/ day” in Binh Phuoc province.
Compliance with regulations on restricting crowds during COVID translation, the commencement ceremony of The central textile and dyeing wastewater treatment plant of Minh Hung – Sikico IP was held simple but full of rituals necessary.
The speciality of system is the ability to receive raw wastewater directly from the textile and dyeing factories in the industrial park, no need to go through the preliminary treatment steps like other industrial parks, but still ensure standards of discharge into the environment in column A.
Representatives of the Investor – Minh Hung Sikico and GS E&C with the General Contractor – Koastal Eco performed the commencement ceremony of the central textile and dyeing wastewater treatment plant of Minh Hung Sikico IP, Phase 1
In addition, the system is fully automated through PLC / SCADA control and monitoring system, making operation simpler, reducing operation costs and enhancing the ability to monitor the system 24/24, brings many benefits to the Investor in the future.
This is also the 8th project in the list of the central wastewater treatment plant projects of industrial park with a capacity of over 10,000 m3/ day implemented around the country by Koastal Eco Group (03 projects with a capacity of 10,000 m3/ day and 05 projects with a capacity of 15,000 m3/ day).
Koastal Eco Group would like to thank investors who have trusted in giving us the opportunity to perform environmental protection works. Koastal Eco Team is committed to always completing the assigned work better than commitmented and above expectations.
Tiếng Việt 简体中文