Ending the challenging 2020 year, Koastal Eco Group welcomes the new year 2021 with many great aspirations and goals.

Ending the challenging 2020 year, Koastal Eco Group welcomes the new year 2021 with many great aspirations and goals.

Koastal Eco Daily Activities

Posted on: 31.12.21

Ending the challenging 2020 year, Koastal Eco Group welcomes the new year 2021 with many great aspirations and goals.

In the last days of 2020, Koastal Eco Group was trusted by investors to sign 02 EPC Contracts “Wastewater treatment system of Viet Thang AG 3 High-tech Pig Farm – capacity: 72,000 pigs/ year” and “Renovating and upgrading the wastewater treatment plant of Masan MB Factory up to capacity of 1,050 m3/day”.

The year 2020 with many events has overturned everyone’s life and made the Vietnamese and global economies very difficult. However, with a lot of effort by the team of company and apply a series of risk reduction solutions, Koastal Eco had a relatively successful year with many signed and implemented projects including:

1. Wastewater treatment plant for Showroom Tien Son – Bac Ninh.

2. The ultrapure water treatment system RO for CPV Food Binh Phuoc Factory.

3. The seawater desalination system for Nha Trang city Eco-tourism area.

4. Wastewater treatment plant for New Hope pig farm, Binh Phuoc province.

5. The wastewater recycling system using UF membrane technology for CPV Food Binh Phuoc Factory.

6. Wastewater treatment plant for Viet Thang – AG 3 high-tech pig farm.

7. Renovating and upgrading the wastewater treatment plant of Masan MB Factory in Nghe An.

8. Water treatment plant for MNS Meat Factory in Long An.

9. Wastewater treatment plant of TH Thanh Hoa Dairy Farm – Capacity: 1,600 m3/ day.

10. Upgrading the central wastewater treatment plant of Dat Do 1 Industrial Park in Ba Ria Vung Tau – Capacity: 2,000 m3/ day.

11. The central wastewater treatment plant of Thu Thua Industrial Park in Long An – Capacity: 2,000 m3/ day.

12. Textile and dyeing wastewater treatment plant of YiDa Vietnam factory in Phu Tho – Capacity: 6,000 m3/ day.

13. Pump station and emergency pond for the wastewater treatment plant of CPV Binh Phuoc factory – Capacity: 8,000 m3/ day.

14. MEP design for Nhieu Loc Thi Nghe Urban Wastewater treatment plant in HCMC – Capacity: 480,000 m3/ day.

In particular, in 2020, Koastal Eco Group is proud to be in partnership Acciona (Spain) – Vinci (France) selected the local unit, to implement of the design work for “Nhieu Loc – Thi Nghe wastewater treatment plant project, total capacity of 480,000 m3/ day” in Ho Chi Minh City with the second largest scale in Southeast Asia.

With all respect and gratitude, Koastal Eco sincerely thank you to customers – partners have trusted and selected Koastal Eco for the water and wastewater treatment contracts. At the same time, the Board of Directors also thanks to members of Koastal Eco Group for together to overcome the challenges of the past year COVID. Koastal Eco hopes to continue to cooperate with customers and partners in 2021.