EPC Contract signing Ceremony – The central wastewater treatment plant stage 3 of Nhon Trach III IP, capacity: 3,000 m3/day.

EPC Contract signing Ceremony – The central wastewater treatment plant stage 3 of Nhon Trach III IP, capacity: 3,000 m3/day.

Project news

Posted on: 30.06.15

EPC Contract signing Ceremony – The central wastewater treatment plant stage 3 of Nhon Trach III Industrial Park

Recently, The Investors – Tin Nghia Corporation – and the General contractor – Koastal Eco Group – have been taken place the EPC contract signing for project “The central wastewater treatment plant stage 3 of Nhon Trach III IP, capacity: 3,000m3/day”.

The plant has been designed with two-step treatment process:

  • Step 1 – Physicochemical treatment and decolorized reagent treatment step for the removal of suspended solids, metals, color content in wastewater;
  • Step 2 – Biological treatment step to treat the pollutants.

This is the fourth contract between Koastal Eco Group and Tin Nghia Corporation which further demonstrates that Koastal Eco Group is always a specialized, reputable and reliable partner in the Wastewater treatment for industrial Park.

viTiếng Việt