Recently, The Investors – Tin Nghia Corporation – and the General contractor – Koastal Eco Group – have been taken place the EPC contract signing for project “The central wastewater treatment plant stage 3 of Nhon Trach III IP, capacity: 3,000m3/day”.
The plant has been designed with two-step treatment process:
-
Step 1 – Physicochemical treatment and decolorized reagent treatment step for the removal of suspended solids, metals, color content in wastewater;
-
Step 2 – Biological treatment step to treat the pollutants.
This is the fourth contract between Koastal Eco Group and Tin Nghia Corporation which further demonstrates that Koastal Eco Group is always a specialized, reputable and reliable partner in the Wastewater treatment for industrial Park.
Tiếng Việt