EPC Contract signing Ceremony – The wastewater collecting system and Kim Ha Central wastewater treatment plant of Dai Dong Hoan Son IP – Total capacity: 10,000m3/day

EPC Contract signing Ceremony – The wastewater collecting system and Kim Ha Central wastewater treatment plant of Dai Dong Hoan Son IP – Total capacity: 10,000m3/day

Project news

Posted on: 18.11.17

EPC Contract signing Ceremony – The wastewater collecting system and Kim Ha Central wastewater treatment plant of Dai Dong Hoan Son IP

Following the success of previous central wastewater treatment projects with the capacity more than 10,000 m3/day, on August, 2017, Koastal Eco Industries Co was honored to be a general contractor of the project “The wastewater collecting system and Kim Ha central wastewater treatment plant Kim Ha at Dai Dong Hoan Son IP , total capacity : 10,000 m3/day” by signing the EPC contract with the investor – Kim Ha Consulting and Investment Joint Stock Company.

Locating in central of key economic triangle in the North, Dai Dong Hoan Son IP is invested with full functional zones and infrastructure in order to attract local and foreign investors.